Development of electromagnetic shielding under the requirement of resistance and pressure synchronization

s2 As shown in the figure below, the customer has the resistance requirement at the same time as the pressure is required. At this time, the relationship between the spring force and the resistance needs to be balanced. The best way is to rely on scientific test results to assist engineers in selecting materials or changing the design structure to improve the requirements! For this we have developed a pressure and resistance tester!

1. Independent research and development of pressure resistance tester. Specially designed test equipment for conductive foam compression resistance and pressure. The tester's resistance is 0.001Ω, the pressure measurement accuracy is 0.1g, and the resistance and pressure values of three different compression heights can be measured each time. The data is recorded after the compression height is maintained for 15 seconds, and then the measurement of the next compression height is performed.

konlida pressure resistance tester

2. Scientific verification of products using testing equipment. Improve the rebound force: first replace the different material verification, reduce the rebound force, the resistance also becomes larger, then change the conductive cloth stacking method, reduce the rebound force while ensuring the resistance is unchanged.

development of electromagnetic shielding under synchronous requirement of resistance and pressure development of electromagnetic shielding under synchronous requirement of resistance and pre ssure1


Compressed to 0.25mm rebound force (N) Compressed to 0.25mm resistor (Ω)
Original drawing 9.289 0.015
Use 18kg foam 5.931 0.069
Use 3D-PP0028A hot melt cloth 3.989 0.068
Use 4701-30-25031—04P foam 29.814 0.015
Conductive cloth does not overlap 6.986 0.015